E.ON Next Solar Export Tariffs: Rates 2026

Checked 10 July 2026: E.ON Next lists three residential flat-rate export routes at 17.5p, 13p and 6p per kWh. The top rate is tied to a qualifying E.ON installation; the middle rate requires eligible E.ON import supply; the public Flex summary does not list the same import condition.

Short answer: Next Export Premium v3 is not a general rate for every E.ON customer. It is a one-use, 12-month offer for qualifying installations by E.ON Installation Services from 10 November 2025.

E.ON Next residential export rates

TariffRateMain public conditions
Next Export Premium v317.5p/kWh12-month fixed rate; E.ON Installation Services solar and/or battery installation from 10 November 2025; residential system up to 15kW.
Next Export Exclusive v313p/kWh12-month fixed rate; E.ON Next import tariff, excluding identified time-of-use tariffs; residential system up to 15kW.
Next Flex Export v16p/kWhVariable rate; eligible renewable generation up to 5MW; public summary does not state the Exclusive import condition.

E.ON also lists an 8.5p business tariff. It is not used as a residential comparison rate.

Premium v3 eligibility traps

  • The installation date and installer matter.
  • The public page limits the residential system to 15kW.
  • The tariff is limited to one per property and does not renew.
  • An older quote may carry a previous rate; E.ON says the installation quote governs.
  • The rate is fixed for 12 months, but the next tariff can be different.

Which import tariffs qualify for 13p?

E.ON says Next Export Exclusive v3 requires E.ON Next import supply but excludes specified time-of-use tariffs such as Next Drive. Economy 7 and Economy 10 are treated differently in the public footnote. Confirm the exact import product before moving export.

Worked annual export payments

Measured export17.5p13p6p
1,000 kWh£175£130£60
2,000 kWh£350£260£120

Documents E.ON lists

  • MCS or Flexi-Orb certificate.
  • Proof of address where E.ON did not supply or install.
  • Smart/export meter photograph showing serial number, model and export reading.
  • System schematic.
  • Proof of ownership and DNO information where required.
  • Export MPAN or information for its creation.

E.ON warns that high demand can lengthen application processing. Do not assume export payments start on the application date; wait for the confirmed export account and start date.

Which E.ON route fits an existing non-E.ON system?

For equipment not installed through the qualifying E.ON route, compare Next Flex Export v1 with Next Export Exclusive v3. The 13p Exclusive option can require moving import supply and excludes the time-of-use products named by E.ON. The 6p Flex page does not state that same import requirement, so it can be the more relevant starting point where the household wants to preserve an existing import deal.

Generation reading or export reading?

E.ON asks for the smart or export-meter register, not the separate generation meter total. Generation includes solar used inside the home; export is only the electricity sent to the grid. Confusing the two can greatly overstate expected payments and can delay validation when the submitted reading is impossible for the export MPAN.

Compare before choosing

Use the finder to remove explicit conflicts, check the source record and model a lower post-fixed-term rate in the payback calculator.

Compare supplier-specific guides

Research context: the UK Solar Export Tariff Transparency Report 2026 shows how headline rates differ from strictly open rates and documents eligibility ties and public-source gaps.

Sources and official guidance2