Solar export tariff data: reviewed rates and history

Compare advertised solar export payments and the conditions attached to them. Every record links to the supplier’s own information, with a dated history so you can see what we checked.

Rates and source gaps checked: 21 October 2026. Selected suppliers; this is not a whole-market comparison. Check the supplier’s latest price and eligibility before applying. See the dated history.

Download the reviewed data

29 records across 16 selected brands: 26 published all-day rates and 3 source gaps.

Download current CSV Download current JSON

The JSON includes source links, observation dates, eligibility, field definitions and the method. Earlier releases remain available in the history.

Rates and requirements

One kWh is one unit of electricity. A flat rate means the same price throughout the day; it does not necessarily mean the price is fixed for a year.

Advertised offers checked 21 October 2026
Supplier and offerExport paymentBuy electricity from supplier?Buy its installation?Battery required?Important conditions
Good Energy
Solar Savings Exclusive
25p/kWh
fixed for 12 months
RequiredRequiredRequiredFor customers whose solar panels and battery were installed by Good Energy Solar; rolls to Solar Savings after the fixed term.
So Energy
So Solar Smart Export Guarantee - first year
20p/kWh
published first-year rate; current tariff letter governs
Check termsRequiredRequiredSo Energy advertises 20p/kWh with its solar proposition; its supporting article says this is the first-year rate and describes 4.5p/kWh after that. The public summary does not clearly state every import-supply condition.
EDF
Export Exclusive 12m V3
18p/kWh
12-month offer; term sheet governs price status
RequiredRequiredNot requiredQualifying EDF or Contact Solar route for solar, battery or both after 2 March 2026; see the tariff terms and term sheet.
E.ON Next
Next Export Premium v3
17.5p/kWh
fixed for 12 months
Check termsRequiredNot requiredFor a solar and/or battery installation by E.ON Installation Services from 10 November 2025; the public summary does not state an import-supply requirement.
ScottishPower
SmartGen Premium Plus
15p/kWh
variable
RequiredRequiredNot requiredRequires ScottishPower import supply and solar panels and/or a solar battery installed by ScottishPower.
Supplier-stated effective date: 2 August 2025.
EDF
Export 12m V2
13p/kWh
fixed for one year
RequiredNot requiredNot requiredFor eligible existing residential EDF electricity customers. This offer version differs from the July snapshot; an existing customer’s contract may retain a different price.
E.ON Next
Next Export Exclusive v3
13p/kWh
fixed for 12 months
RequiredNot requiredNot requiredRequires an E.ON Next import tariff, excluding the time-of-use tariffs identified by E.ON Next.
British Gas
Export Premium
12p/kWh
variable
RequiredNot requiredNot requiredBritish Gas must supply the property's electricity; exclusions in the full terms apply.
Good Energy
Solar Savings
12p/kWh
variable
RequiredNot requiredNot requiredAvailable to Good Energy electricity-supply customers with solar panels; the variable rate can move up or down.
Octopus Energy
Outgoing Octopus
12p/kWh
variable flat rate
RequiredNot requiredNot requiredRequires an Octopus import account and a compatible import tariff; rates can change with notice.
ScottishPower
SmartGen Premium
12p/kWh
variable
RequiredNot requiredNot requiredRequires ScottishPower import electricity at the same address as the installation.
Supplier-stated effective date: 2 August 2025.
British Gas
Export Extra
8p/kWh
variable
RequiredNot requiredNot requiredBritish Gas must supply the property's electricity; exclusions in the full terms apply.
Utility Warehouse
UW Smart Export Guarantee - Bundle
8p/kWh
standard variable
RequiredNot requiredNot requiredRequires Utility Warehouse Energy plus two or more additional qualifying services such as broadband, mobile or insurance.
Supplier-stated effective date: 1 October 2024.
E.ON Next
Next Flex Export v1
6p/kWh
variable
Check termsNot requiredNot requiredThe public eligibility summary describes new and existing customers but does not state an import-supply requirement.
ScottishPower
SmartGen
6p/kWh
variable
Check termsNot requiredNot requiredThe public tariff summary does not state an import-supply condition for the standard SmartGen route.
Supplier-stated effective date: 2 August 2025.
EDF
SEG Export Variable Value
5.6p/kWh
variable
RequiredNot requiredNot requiredExclusive to EDF electricity customers; EDF says the rate can move up or down.
Pozitive Energy
PE Smart Export Guarantee
5p/kWh
published flat rate; contract governs
Check termsNot requiredNot requiredA replacement official page now publishes 5p/kWh. Battery-stored electricity is excluded. The public summary does not explicitly state an import-supply requirement. This resolves a source gap, not a proven rate increase.
So Energy
So Energy standard export rate after first year
4.5p/kWh
published follow-on rate; commencement letter governs
Check termsRequiredRequiredSo Energy's official article says it pays 20p/kWh in the first year of solar and 4.5p/kWh after that. Its general SEG page says non-supply customers can apply, but the actual rate and conditions are set in the Smart Export Commencement Letter.
Octopus Energy
Smart Export Guarantee
4.1p/kWh
flat rate
Not requiredNot requiredNot requiredOctopus describes this as an export-only route that can be combined with another supplier's import tariff.
Voltx Power
Voltx Smart Export Guarantee
3.02p/kWh
published rate; current contract governs
Check termsNot requiredNot requiredVoltx publishes 3.02p/kWh for eligible exported energy and twice-yearly payments. No import-supply requirement is stated on the public summary.
British Gas
Export SEG
3p/kWh
variable
Not requiredNot requiredNot requiredBritish Gas says this rate applies if it does not supply the property's electricity, and to certain other applicant categories.
E
E SEG Tariff
3p/kWh
variable
Check termsNot requiredNot requiredE publishes one variable SEG tariff paying 3p/kWh. No import-supply requirement is stated in the public eligibility summary.
EDF
SEG Export Variable
3p/kWh
variable
Not requiredNot requiredNot requiredAvailable whether EDF or another supplier provides the home's imported electricity.
Ruby Energy
Ruby Smart Export Guarantee
3p/kWh
official page uses both variable and fixed wording; contract governs
Not requiredNot requiredNot requiredRuby publishes 3p/kWh and says no import-tariff switch is required. Its page describes the offer as both variable-rate and fixed-rate, so the signed terms should resolve that inconsistency.
Utilita Energy
Utilita Smart Export Guarantee
3p/kWh
published rate; current terms govern
Not requiredNot requiredNot requiredUtilita publishes 3p/kWh and states that applicants do not need to be Utilita import customers.
Utility Warehouse
UW Smart Export Guarantee - Standard
2p/kWh
standard variable
Not requiredNot requiredNot requiredUtility Warehouse describes the standard 2p/kWh tariff as available to everyone who meets the SEG requirements.
Supplier-stated effective date: 1 May 2022.
Fuse Energy
Public rate not located on official site
Public rate not located
not publicly verified
Check termsCheck termsCheck termsThe official SEG explainer was available but did not identify a Fuse-specific current export price. Generic market examples are not treated as its own offer.
Outfox Energy
Public rate not located on official site
Public rate not located
not publicly verified
Check termsCheck termsCheck termsReviewed homepage and help-centre search for export. No public SEG rate located in the pages examined. This is a limited discoverability finding, not a statement that no tariff exists.
SmartPay Energy
Public rate not located on official site
Public rate not located
not publicly verified
Check termsCheck termsCheck termsNo public export price was located on the official website during this review. This is a source gap, not evidence that the supplier offers no SEG tariff.

How to use this comparison

  • Required: the supplier states that the condition applies.
  • Not required: the published route does not require that condition.
  • Check terms: the public summary does not establish the answer. Do not assume you qualify.
  • Public rate not located: we could not verify a supplier-specific price in the official pages examined. This is not a zero rate, or proof that no tariff exists.

Use the finder to narrow the offers, then compare your import unit price, standing charge, equipment costs and eligibility. A high export rate alone does not establish the cheapest overall arrangement.

Coverage and limitations

This is a selected comparison of residential all-day offers, not the whole market. Dynamic and time-of-use rates, specialist business-only offers and individually negotiated prices are outside the numeric table. Supplier participation is checked against Ofgem’s current SEG list. Good Energy’s commercial export offers provide additional market context.

Changes over time

Our history page separates observed offers, supplier-stated effective dates and corrections. We retain the earlier selected dataset. We do not invent figures for months we did not check.

Reuse and corrections

Reuse the CSV and JSON under CC BY 4.0. Credit Here4Solar, link to this page, identify the version and observation date, and explain any changes you make. Send a correction with the supplier’s source link.