What is a plug-in solar kit?
A small set of panels supplies electricity through a suitable mains socket. An inverter changes the panels’ electricity into the type your home can use. The kit helps run appliances while there is daylight.
The limit is 800 watts of power into the socket. Watts measure power at a moment in time. The panels’ combined rating can be higher, because the inverter limits what enters the socket. That is different from how much electricity the kit makes over a year.
Check these points before you buy
Use one compliant device per home. It must plug straight into a suitable mains socket. Do not use an extension lead, an altered plug or an international adaptor. Do not modify a device or join devices together.
Use the full Energy Saving Trust checklist as you plan. Ask a qualified electrician about wiring or sockets you are unsure of. Do not open electrical covers or try repairs yourself.
Read the full buying and safety checklist
1. Check the exact product
Check the make and model on the ENA device register linked from the checklist. Buy a product made to meet the UK rules. An imported kit or a familiar-looking plug is not proof that it meets them.
Read the maker’s instructions, warranty and fault-support details before purchase. Ask for the full cost, including secure mounting and any electrical work.
2. Get any permission you need
Check planning rules and any landlord, freeholder or building-manager approval before buying. Flats and protected buildings can have extra conditions. Also check your home insurance.
In England, the plug-in planning rules restrict mounting on timber walls, balconies, enclosures and timber-clad exteriors. Other building and fire rules may apply. Ask the council or building manager about your proposed position. Our planning guide links to each nation’s rules.
3. Check the socket and wiring
The socket must be on a circuit that does not also serve lighting or hardwired appliances, such as a cooker. An outdoor socket must be suitable for the weather and fitted by a qualified electrician.
Do not fit a kit if your fuse box has old-style rewireable fuses. Ask an electrician about the wiring, circuit and protection. Get advice if you need a new socket or cannot tell whether the existing one is suitable.
Energy Saving Trust also says to ask an electrician if the panels’ total rating is over 960 W. This is a separate check from the 800 W limit into the socket.
4. Choose a safe place
The panels and frame need to stay secure in strong winds. Cables must reach the socket directly and avoid trip hazards. Get professional advice if the mounting, building strength or fire safety is unclear.
Follow the maker’s instructions and local building rules. Leave roof access and drilling near hidden pipes or cables to a qualified professional.
5. Check any system you already have
If you already have roof panels or a battery, ask the original installer or an electrician before adding a kit. They should check that it will not overload the system. They can also check whether the local electricity network needs to be told.
6. Register the kit after installation
Registration is a legal requirement. Use the registration link in the Energy Saving Trust checklist. Have your postcode and the exact make and model ready. Follow the official steps and keep a record of the confirmation.
Will it help with your bills?
Look at when you use electricity, the daylight and shade at the planned spot, and the full cost. A small kit is most useful when you can use its electricity as it is made. It will not run a whole home at all times.
Ask for a yearly estimate and the assumptions behind it. If you have suitable roof space, also compare the cost of a fitted rooftop system. Neither option comes with guaranteed savings.
If a fault develops
Contact the maker or a qualified electrician. Do not open or repair the panels or inverter yourself. Follow the maker’s safety instructions. For smoke, fire or immediate danger, keep away, leave the area and call 999.
Guidance checked 29 October 2026, including Energy Saving Trust’s checklist updated 8 October 2026.